Well, today the missing weatherboard (at least that's what I think it is) over the garage was installed. It was the final thing we were waiting on to complete the lock up stage. So today off to the bank to get a hefty transfer over to PD's account. Can I just say OUCH!!! I really hope that we get handover before 11 August,the interest bill just got a swift kick!.
The garage in all it's glory..
The fixing started today. My sidelight has been installed, quite a lot of architrave has been cut and left in rooms waiting to be put up. A few windows have already been trimmed. From the inside..
And from the outside. Sorry for the poor photo quality. I had to take these myself. DH was otherwise engaged.
The bath has been installed on a bed of bricks and the stuff that they make the shower bases out of has been used as a bed on top of the bricks.
This is the spa install. You can see they have used about half a pallet of bricks, they go right the way across the spa to the back wall and the entire length of it as well. Again a bed of the shower base stuff ( like my technical talk???)
Downpipes have been installed and the drainage has been moved. Now DH can stop stressing that there is a storm water pipe in the middle of the driveway!
It looks like the next BSS inspection has also happened as there are marks on the walls everywhere. You'd think that a really tall three year old had gone mad with a pencil in there.
I'm not sure whether to be concerned or not. Our SS has seemed to be on the ball with everything so far and has attended to most of our issues so we'll give it a while and see what he says.
Can't wait to see the doors hung!
