Sunday, March 22, 2009

It must be love...

Hello All.

Sorry for the long break between posts. Life has been hectic everywhere! We are trying to get our current house on the market. Culling, cleaning, trips to the tip, trips to a storage unit, stuff for charity, toy drives etc.

On the house front, we were supposed to be at lock up last Friday (13th, any one else a bit worried? LOL) As I pointed out to the SS, if I can walk through where the sidelight is supposed to be, it ain't locked up! Anyway they then nailed a bit of board across there as it will not be installed until "fix stage" apparently. Our friendly inspector was out there this Friday and PD still have one thing to do before we hand over the money. I have emailed the CSC to let her know.

However, he did note that the timber bifolds and the french doors in the alfresco are 11mm out of plumb and that the lintel and brickwork need to be taken down and done again. We have passed this on too. Perhaps we won't make that August 11 deadline after all ???

Our eaves (all two of them) are in as well as the portico roof. Almost all of our plastering has now been stopped. The only real thing left is to put up the cornice and, of course, fill all the bits they missed. From what we have been told they come back this week to put the cornice up and the fix carpenter starts mid week this week.

This is the master ensuite with niche. Lovely!!


The ensuite cabinetry. Bottom cupboards are Black Tulip and the bench is stipple burnished plum. Handles are black nickel bows. Quite happy in the end with the basins. Although I love the basins that look like a bowl on the bench, they are not practical for us. DH is very tall and I am vertically challenged. LOL. We have the benches all set to 900, with the bowl on top that would have meant that I needed a step ladder to clean my teeth LOL.



And another picture because I love the way it turned out!


The bathroom. Top is carrera and the bottom is Peacock. This is the battle I lost. Note a small win as I did get the drawers added to the unit. Trade off is that the basin is not centred. We're not worried. With two girls, we NEED storage in the bathroom.

The tiles we got at NT are almost an exact match for this laminex. We are using the tiles on the floor and the walls of the bathroom. they look like a white marbled with grey. Really happy that this turned out so well. The small chips of laminex make it hard to imagine the detail in the larger patterned pieces. We are having green shaded feature tiles.



Front on, the bathroom vanity showing the drawers on the side of the unit.

The kitchen, bottom cupboards are stippled burnished plum, top is antique white. Notice template for my sink. This is the battle I won. The colours look a bit washed out. It was quite overcast. The white stickers give it the designer look...


This is the back wall of the kitchen, with my pot drawers. Hmmm, not as big (wide) as I thought they were...
Kitchen bench from the side. We added an extra set of drawers here. Otherwise it was a "dead corner" cupboard as the other side is up against the sink. The open space is the Walk in Pantry.

You can just see, hiding in the dishwasher space, the powder room cupboard. The waste pipe is in the wrong place for the kicker and has to be moved before the cupboard can be installed.



Mortar Issues. There are a few places like this however this is at the front of the house and it does stand out like dog's / budgies you get the drift... The SS says it is an easy fix, but I am not so sure. Will find out if any of my bricks turn green over the next few days/weeks as the bricks were cleaned last Monday. So the brickie will be back to fix up all the areas where they have blasted the mortar out between the bricks I assume??? Can anyone tell me if this is what happens and if it really is an easy fix???


Hope you guys appreciate all these pics! Blogger is giving me hell uploading pics tonight but I LOVE my cabinetry colours. No offence to anyone out there but there are no neutrals in sight! Just vibrant colour.

I tried to upload the laundry, black with white. What a great colour scheme!!!! but it just keeps cutting out and quite frankly, I am over trying to upload pics.
Have a good one!

Thursday, March 12, 2009

Plastered.. I wish!

Hi all,

Bricking was finished last Thursday.





This week has seen some interesting developments. Our plasterers, who were supposed to show up on the 25th February finally found the house and started yesterday (Wednesday). I can say, without fear of contradiction, that these guys are only in it for the money. No pride in their work, no care factor, basically if they gave a continental, they would not be there. Perhaps we have been lucky with the majority of trades on our site, most of them have been pretty good.

We can only hope that when they stop the plaster that they can fix all the dings, dints, holes, crumbled edges etc that we are seeing so far. And that they are alot better at stopping than hanging. Also, we found sound screen on the floor where it had obviously fallen out, as you can see from the pic below




We know because we tried to put it back in the night before. The plasterers had trodden on it and it would not stay in. So much for the "plasterers are required to put it in, it's part of their contract". This is the room and it's been plastered, sound screen still on the floor...


Good news (I think) is that the bi folds have arrived and are sitting in the garage. Perhaps the bricks will get cleaned before they go on, but then again, perhaps not. Also the spa has been delivered and it is the right one!
Below is the lounge room with the larger windows and the spa there in the corner...

So, more plastering to come. Looks like they might have run out of ceiling boards.. This is the dining room with french doors to the alfresco...


On the still waiting front, nothing has happened with the guttering issues, nor with the holes in the roof/tiles. Now when it rains, the water will go down the wall, into the insulation batts and against the plaster that has now been hung. Similarly, the roof truss has not been fixed but the ceiling has been hung. The missing HDMI cable for the family room was not put in before they hung the plaster either. Looks like a call to the main man might be in order.

Sorry guys, feeling a little melancholy over this. Reading some other blogs with issues, I guess I am just waiting to have major issues as well, although secretly hoping that it will all turn out ok. We also have to start getting our current house ready to put on the market, not fun at all!!! Still no sign of a lock up invoice, they need to get the bi folds on, roof fixed and front sidelight secured still. So, no invoice this week. Much better that the bank keep their money for a bit longer.
Have a great week every one!

Wednesday, March 4, 2009

I love my bricks...

Hi everyone,

Not a lot has actually happened since the last post. Some of our items have been fixed, we now have window locks on all our windows and the right glass in the ensuite window. Plaster is still sitting there, if any one sees my plasters can you please send them over LOL! We did get our internal garage door though. We also went up over the weekend to put in some extra sound screen. What a PITA, glad we got PD to do almost all of it for us.

But the best bit is that today the front facade bricking was finished. The mortar is not dry everywhere, that's why the colours look a little strange. But, how good does this look!!! We are not having render, so this is it and we love it.



This is from across the road,I know it looks weird with the cage and port-a-loo right in front of the house...





Garage has lintel in place and bricking over



This is my favourite picture so far



We are a bit concerned at the bricking over the timber doors/windows. All the aluminium windows have the lintels and bricks right over the top of the window frames. The timber window and timber doors all have an "extra" area above them (about a brick or so in height) then the lintel, then the brickwork. Have a look at the picture below. This is the timber window and the bi folds in the alfresco area.


Same with the french doors (below) and the front and back doors which are also timber.

Can anyone tell me anything about this? Is this normal?

We also had some rain YAY! so we now know that the roof leaks in "bed 2", surprisingly the rest of the house appears to be water tight.
Hopefully, plastering next. "J" told us it was supposed to happen on the 25th, but I think he meant February, otherwise we'll be waiting a while longer.

The bifolds were also supposed to come this week, so once they close up the sidelight, we'll be at lock up. I feel a massive invoice coming on....

Have a good one!

Thursday, February 26, 2009

Meeting the Man in charge..

Hello all,

This morning we met with our SS for the first time, "J". All our communication thus far has been emails and phone conversations. We had a long list of issues and questions, as everyone does. So, bright and early at 7am we met at the house.

We are both really pleased with our SS and his approach. He went through each of our concerns individually and let us know what would be done in each case. As we went through other things cropped up and those were listed. "J" was meeting the chippies on site after us so he was going to get them to address these issues and he is organising a roof check too.

Our most worrying issue, cracked roof truss..



"J" also spoke about what happens from here outlining what will be happening in the short term. Wisely, he refrained from venturing an opinion on when he thought it might be finished!! Still cannot see how it could take until August 11. But lots of things can stuff up from here. (Hope they don't of course!)

Anyway, bricking has continued this week and we are really happy with the way that the bricks are looking now...



The insulation both sound and wall is now in, it went in Monday and these guys were amazing. Every little space everywhere was packed. No hole went unfilled (leave that alone!!) and we were surprised at how good a job it was.

Insulation now installed..


Plaster has arrived. Supposedly the plasterers were supposed to show up on the 25th, (Ummm... No Appearance Your Worship!) "J" is going to chase them up.
From the front door, looking down the hallway. Plaster stacked in the family room...


Then came the sparkies, without a doubt, the messiest, could not give a continental, lazy B*'s, you'll ever come across. Insulation pulled out and ripped off around power points, holes, section. Some places they just pulled the bottom half of the batts completely off. One thing about sound screen, if there is a hole; sound will travel through it, rendering the rest of it as useless. The sparkies left the house littered with sound screen "bits", wall bat "bits" and crap. "J" said that it is part of the plasters contract that they put the insulation back in if it has fallen out. But the insulation has to be there first and we went up each night and put all the insulation back in where we could. We will get another packet of sound batts this weekend and fill everywhere else.

Lots of plastering and cornice to come...



Have a great week everyone!