Thursday, May 28, 2009

We have a DATE!

*********************************************************

We have PCI and Hand Over Dates!!!!!!!!!!!!!!!!!!!!

*********************************************************


PCI is set for Thursday, 11 June and Hand Over for a week later on the 18th of June.

What a relief! That will give us a swap over time of just over two weeks so we will have time to get the flooring done and hopefully concreting as well before we move in properly.


Now comes the fun bit of trying to co ordinate concreting, phones, Internet, flooring, wardrobe fit outs, aust post re directs etc etc. I'm just really glad that we are not trying to move in 2 days before we settle on our current house.


I have been able to get in this week. The second fixing carpenter was there, so I took the opportunity to get a few photos before the camera decided that it's useful life had expired and up and died on me. Luckily I was still able to get some of the pics off it.

Lots of happenings this week..
Door and cupboard handles are on as are the door stops. All the electrical fit out seems to have been done. Lights, power points, light switches, flood lights outside, junction boxes, smoke detectors and down lights are all in place. Alarm has been fitted, although as we told PD three weeks ago, one of the leads for the sensor is in the wrong spot. This has not been fixed and now they have fitted the sensor to it in the wrong spot. The outside alarm box also seems to have been fitted upside down. I have never seen an alarm box with the blue light on top?



Now on to the pics!


Exhaust fan in the ensuite Looking for cables. These holes in the ensuite and others in the laundry were really the only "problem children", most light switches, power points etc seem to have been found in the right place, first go.
Love the downlights over the kitchen bench!! We also have downlights under the kitchen cupboards and in the study over where the desks will sit.
Just one of the 6 ganger powertainment powerboards, we have three in the house for TV's
Knobs are on all the cupboards now
Door handles and privacy locks are all on too. Really happy with the look of the two tone, just a little bit different.
Things looking a bit busy in the Study, all the network cables are terminated here. We'll do our own patch panel after handover.

I also found out that insurance is our responsibility from the PCI once we sign. I thought we would not have to have insurance until hand over so, I have to organise insurance for the new house a bit sooner than I expected.

Still waiting on mirrors and shower screens and the insulation too. We saw the insulation bags in the garage so I expect that will go in tomorrow. The painter has to come back and finish off the feature walls, apart from that I think most things appear to be pretty much done, it really looks like it is just finishing off bits and pieces now.
I am still a bit in a daze with getting dates, so apologies if this is a bit of a ramble. All of a sudden, it is real. We are really getting PCI, we are really going to have a house rather than just sometime in the future, all of a sudden we have dates and things have to happen around those dates. It almost feels surreal. LOL. After all the waiting and hoping, it's really happening!

Thursday, February 19, 2009

Bricks and Spaghetti

Hello everyone!

What a fun week it has been so far this week. I fear we are becoming spoilt, as when we went to the house on Monday nothing appeared to have happened and we felt quite disappointed. I can't complain about our SS, he has the trades lined up to come in bang, bang, bang and so far everything has been great with the build. If it keeps up at this pace, I am sure that handover will be before 11 August. Fingers crossed!

I spoke to the SS on Tuesday, as we have to move the cold water point in the WIP. S has a bulging disc in his back from, you guessed it, moving a fridge! So, our cold water point has to go above the fridge so that we can change the filter without having to move the fridge every 6 months. He said he'd speak to the plumbers. He also said that we have to have the gas meter at the front of the house as it has to be 1 meter from the meter box and 600 from the HWS. He seems pretty pedantic about things, so it's going to be on the side of the study.

The Ducted Heating unit and the ducting were installed on Tuesday. S climbed into the roof to make sure it was the upgraded unit (while J had heart failure!!!!) and found that PD place an alarm on the heating unit. Makes sense I suppose given the price of these things, but it is a sad comment on the world we live in.

There's a heater up there somewhere...

Fit off of the plumbing inside the house...

The Gas lines to the hot water service were put in...

The offending cold water point in the WIP...


Then on Wednesday, the Plumbing was finished off and the brickies gear arrived on site. no brickies, just the gear. Thursday night we rocked up and BRICKS!!!!!

We have Nougat bricks by Austral. Like many other bloggers, when the bricks arrived I was not too sure about the colour. When we got to see the bricks laid up close, I was still not too sure and a bit disappointed. Then I saw the bricks in full sunlight and they were exactly what we chose. The colour looks soooo different in shade/filtered light compared to full sun. One thing though for anyone contemplating Nougat bricks, go the Off - White mortar, it really completes the look with the bricks.

Bricks!!!



From the front which is in the shade, the bricks look much darker ...

The brickie is really neat so far. This is full sun, bricks are much lighter..


When we got inside, the electrical rough in has started!! Spaghetti everywhere. We were trying to remember the data points, power points,foxtel cables etc. Need to take the plan up and compare.
Some of the spaghetti for the HT area...


More spaghetti and they are not finished..

And the last pic is of our timber window which was stolen and has been replaced!
Now that the electrical is in, we are going up Saturday to put in extra noggins where we need them for pictures, hand rails etc.

Have a great week everyone!